Since the Grenfell Tower tragedy in the UK in 2017, what was once acceptable in the construction industry is no longer.


"Each and every one of the deaths that occurred in Grenfell Tower...was avoidable"

 RICHARD MILLETT KC, LEAD COUNSEL FOR THE INQUIRY


My team and I developed the worlds first true CE-marked Smoke Control Damper for the extraction of smoke during a building fire


PROJECT OBJECTIVE

WHAT IS SMOKE CONTROL DAMPER?

A smoke extraction solution that can be integrated into a building. 


When triggered by heat or smoke detectors, the damper on the floor of origin will open, allowing the smoke to be extracted.


This is normally employed to protect stairwells, allowing safe evacuation of a building.


Engineering Challenges

The Hinge MUST -

The Actuator MUST - 

The Latch MUST -

The Insulation MUST

Risks


Research - Hinges

The UK's number one hinge manufacturer was the obvious choice


The hinges use a patented "Hi-Load" bearing system for maintenance free use with a 25 year guarantee. 


The hinge is CE-marked and cycle tested to 1 million cycles, up to 120KG.


Research - Actuation


Several methods of actuations were investigated.

90⁰ Arm Actuator


A mechanical arm, or powered chain that attaches to the top and bottom of the door.


PRO:


CON:

Chain Drive


A powered chain drive that attaches to the opening vertical edge of the door.


PRO:


CON:

Linear Actuator


A linear actuator, or actuators, that can be mounted in various locations on the door


PRO:


CON:

Research - Latching

Rotary Latch - Reliable, mechanical solution

Electromagnetic Latch - Open / Close feedback


Research - Insulation

The insulation must provide high levels of thermal insulation to block heat transmitance through the door during a fire scenario.

Vermiculite

Spacetherm

Magnesium Oxide

Calcium Silicate


Insulation Testing within a steel door sample

Prototyping


Sketching - 3D Solidworks CAD - Manufacturing Drawings - Half-Size Physical Prototype. 

Large Image - Rear of door.       Top Right - Actuator.       Middle Right - Hinge.       Bottom Right - Latch


Prototyping - Revision 2


Lessons learnt from Revision 1


1 - Before - Sheet metal 'L-bracket' the bent during testing

1 - After - Stronger and stiffer folded and welded sheet metal profile

2 - Before - No thought given to wiring routing

2 - After - Wiring harness routed through the frame

3 - Before - No specific location for the ECU

3 - After - Fixed ECU housing

4 - Before - Welded in latches cannot be removed if damaged

4 - After - Removable cassette for servicability


CE Testing

Air Leakage Test



Conclusion


The door passed in March 2024 - becoming the first product in the world to be CE-rated to EN12101-Part 8 - an industry changing acheievement.

The product has no competition and in coming years, it will become a UK legal requirement to have one every floor of a high-rise building.

Sales are scheduled to start in Q3 / Q4 2024